From a Single Installation to Multi-Site Expansion — A Solar Partnership Built on Proven Savings

What began as a 72 kWp installation at the client’s head office evolved into a long-term partnership, with solar systems deployed across multiple facilities after measurable savings and performance were demonstrated.

Client Type

Manufacturing — Rubber Products Industry

Location

New Delhi, Manesar, and Gurgaon (Haryana)

System Size

Initial Installation: 72 kWp Total Capacity Across Sites: 1.175 MWp+ (cumulative installations across multiple units)

Problem

The client faced high and rising electricity costs across multiple manufacturing units, impacting operational expenses. They required a reliable solution that could reduce energy dependency while ensuring consistent power availability for production.

Solution

Corrit designed and executed a phased solar deployment strategy, starting with a pilot installation at the head office. After demonstrating strong performance and savings, the system was expanded to additional manufacturing facilities with optimized plant sizing for each location.

Results

Electricity Consumption Reduced

Annual consumption reduced from 40 lakh units to 24 lakh units

Significant Cost Savings

Significant Cost Savings Approximate savings of ₹1.5 Crore per year

Repeat Orders Across Multiple Sites

Solar installations expanded to 4 additional units based on proven performance

Long-Term Operational Efficiency

Reduced dependence on grid electricity and improved energy cost predictability

Estimated Environmental Impact

Substantial reduction in carbon emissions through clean energy adoption

Project Expansion Snapshot (Repeat Installations)

Vallabh Smarak, New Delhi
kWp
Factory, Manesar
kWp
Factory, Basai Road, Gurgaon
kWp
Factory, Basai Road, Gurgaon
kWp